Projects
Design and construction recycling and composting plants.

Abu-Keber (Sharkeia),Damietta, El-Kharga( New Valley) , Nga Hamady (Qena), Edco (Benira), Zakzik (Sharkia).
160 ton/day
Aga( Dakahilia), Gharbia Tanta.
320 ton/day
Apri 2003– April 2004

The Ministry of local development, through its technical sector, signed an agreement with the construction of 32 composting plants, to serve the Governorate capital, cities as well as marakez level cities.  ENTAG has signed a contracts with the ( Ministry of Military Production)  to serve as an engineering contractor for Phases 2,3,4 .

ENTAG provided the following services: Process design ,site and topographical surveys; geotechnical investigations; detailed design and engineering for all civil, architectural, electrical works and mechanical equipment.Supply of imported equipment.  Construction management, supervision; testing, commissioning and start-up services.