Design and build municipal solid waste recycling and treatment plant
Lagos State Government- Nigeria
900ton / day.
November 2011
Engineering Capabilities
ENTAG had signed a contract combination withKonsadem Associates LTD Company forLagos state government for supplying & constructing a complete sorting unit as a turnkey project (design phase).
ENTAG is providing the following services:
- Site survey.
- Soil investigation.
- Assess utility site requirements.
- Develop design criteria.
- Develop site master plan.
- Prepare preliminary design report.
- Prepare calculation sheets for all project components.
- Preparing drawings and technical specifications for buildings road and infrastructure, MRF, composting facility and balefill (Epe Site).
- Prepare bill of engineering measurements and initial cost estimates.
Prepare implementation time schedule