Bani sewaf
160 ton / day
Dec.2007- Jun 2008
ENTAG signed a contract with Abo Keir Company for manufacture engineerning for :
• Estabishement of landfill for solid waste
• Design and operation of landfill
• Rehabilitation of the industry
ENTAG provided the following services: Process design ,site and topographical surveys; geotechnical investigations; detailed design and engineering for all civil, architectural, electrical works and mechanical equipment.Supply of imported equipment. Construction management, supervision; testing, commissioning and start-up services.